Over the old with the new. Some new tiling in place at Covent Garden Station, an exact replica of the original, and being placed directly over the old tiles!
Basically every tile is being covered with a shiny new one, in the whole station. The effect is stunning, but I wonder why its being done in this way? preservation or cost cutting?
Note the numbering on the feature parts to ensure they are put up correctly.